Pure Pile Method | High-strength Ground Reinforcement Piles with Zero Soil Influence
Constructing piles with 100% cement milk without mixing local soil. A pure pile method that completely prevents differential settlement regardless of soil quality.
To ensure the long-term structural safety of buildings, it is essential to accurately analyze ground characteristics and implement reinforcement work to prevent uneven settlement. GeoTech's Pure Pile method is an innovative technology that expands the ground laterally with a conical excavation head and directly replaces it with high-strength cement milk to form pile-like reinforcement bodies. The 100% cement milk structure, which eliminates mixing with local soil, allows for stable high strength and quality without being affected by soil conditions, even in diverse ground that includes humus layers. By evenly distributing a large number of reinforcement bodies with a designed pile diameter of 20 cm, we ensure high vertical load-bearing capacity and effectively eliminate the risk of settlement accidents by balancing and supporting the building load across a surface. Additionally, the construction structure generates very little residual soil, allowing for reductions in residual soil removal and disposal costs. At GeoTech, under an ISO-certified quality management system, our specialized construction technicians thoroughly manage real-time data to provide reliable and trustworthy foundation reinforcement.
- 企業:ジオテック
- 価格:Other